Lake Galliard
Client : CJ Fucci
Location : Guilford, CT
PROJECT DETAILS:
- New Dam construction in a highly environmentally sensitive area.
- Due to the nature of this project and the proximity of the reservoir, soil erosion control was an extremely important element of this project with a top priority.
- Erosion control was performed simultaneously with the actual grading operations.All work was dictated by the current days forecasted weather.
- A combination of erosion control blanketĀ over Conwed 2000 wood fiber and tackifiers was utilized for all areas that were considered sensitive locations.
- Having CPESC (certified professional in soil & erosion control) certified employees involved on this project was instrumental in the successful planning and implication of erosion control measures.
DO YOU HAVE A SIMILAR PROJECT?
Contact us about your next commercial landscaping construction project.
Talk to us about your project