Corrective Work

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

PROJECT DETAILS:

  • This was a project that was started by another landscape contractor. The work performed did not meet Empire’s required  level of quality and consequently Empire relieved them from the project.
  • Empire requested that we redo the work correctly and up the their standards,as which we did.

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project

Emergency Route 84 Project Slopes & Channel Stabilization

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

PROJECT DETAILS:

  • Emergency state project
  • Slope plantings
  • Channel and slope stabilization utilizing erosion control mats

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project

Tweed Airport Improvements & Revitalization

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

PROJECT DETAILS:

  • Project involved the re-alignment of existing public  roads which affected the placement of runways and reloacted existing waterways and wetlands.
  • Wetland plantings and erosion control had to be performed in combination with extensive erosion control blaket applications.
  • NEWP Erosion Control / Restoration seed mixture

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project

Busway

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project

Route 66 Improvements & Wetland Mitigation Planting

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

PROJECT DETAILS:

  • Multi Acre Wetland Planting & Wetland Mitigation comprised of wetland plants, wetland plugs and a variety of wetland seed mixes.
  • Large scale roadside planting.
  • Forest re-vegetation primarialy through the use of evergreens.
  • Steep embankment Erosion Control.
  • Sodding.
  • Turf Establishment.
  • Hay Mulching

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project

Route 3 Wetland Revitalization

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

PROJECT DETAILS:

  • Control and Removal of invasive species especially phragmites
  • Supply and install wetland plantings of tubelings, bareroot, and plugs at culvert opening

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project