Pearl Harbor Memorial Bridge Construction

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

PROJECT DETAILS:

  • Ongoing project thru 2016
  • Large planting along Interstates 91 & 95 crossing
  • Erosion control blanket, temporary slope protection, and temporary seeding utilized to achieve NEPDES compliance
  • Hydroseeding using CTDOT 816 seed mixture

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project

Kleen Energy Wetlands Restoration

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

PROJECT DETAILS:

  • Supply and install leaf duff and leaf compost in wetland basins
  • Seeded wetland areas using NEWP Wetmix and NEWP conservation / wildlife mixture
  • Planted wetland basins with native species.
  • Supplied and installed aquatic plugs, bareroot and tubelings
  • Provided temporary seeding for erosion control methods using perrenial rye mixture

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project

 

Merritt Parkway Revitalization

09

Apr
2014
Posted By : ASL Admin 0 Comment
Categories :

PROJECT DETAILS:

  • Supply and install over 18,000 plants and trees on right shoulders and median planting.
  • Control and removal of invasive species over 20 acres completed.
  • 50 plus acres of Turf Establishment completed using custom native roadside mixture.
  • Merrit parkway conservancy oversight
  • Selective clearning and thinning completed to create sight lines for highway signs.
  • Median work completed on overnight shift
  • Airspade tree roots to loosen up compaction caused during construction.

DO YOU HAVE A SIMILAR PROJECT?

Contact us about your next commercial landscaping construction project.

Talk to us about your project